How long an energy certificate (EPC) is validNotes"An EPC ... is valid for 10 years." We flag certificates whose assessment is older than this and ask the visitor to check the details. England and Wales. | 10years | GOV.UK, Energy Performance Certificates (buying and selling your home) | 4 November 2026 |
|---|
Earliest year of weather data PVGIS offersNotesFirst year of PVGIS-SARAH3 hourly data ("PVGIS-SARAH3 Satellite 2005 2023"), the default database for Europe in PVGIS 5.3. Since decision W1 (6 November 2026) we simulate only the latest 5 years up to pvgis_last_year; this sets the earliest year we could use, and the full span is used by the PVGIS reference check (scripts/pvgis-check.ts). | 2005calendar year | PVGIS user manual (EU Joint Research Centre), section 3, radiation database table | 5 November 2026 |
|---|
Latest year of weather data PVGIS offers (and the last year we use)NotesLast year of PVGIS-SARAH3 hourly data. Update when PVGIS adds years (and re-check the API version in src/lib/pvgis/request.ts). | 2023calendar year | PVGIS user manual (EU Joint Research Centre), section 3, radiation database table | 5 November 2026 |
|---|
Year of the official electricity-use statisticsNotesYear of metered consumption behind our annual-use estimates (src/lib/usage/need-usage.json, built by scripts/need-usage.ts). Spot-check a row: the "Multiple attributes tables, England and Wales" file, year 2024, gives median, lower and upper quartile electricity (kWh) by property type, bedrooms, gas present and meter type. DESNZ publishes new tables each June. | 2024calendar year | DESNZ, NEED consumption data tables 2026 (multiple attributes, England and Wales) | 5 November 2026 |
|---|
Solar system losses (wiring, inverter, dirt)Notes"We have given a default value of 14% for the overall losses" (cables, inverter, dirt and so on). Applied to PVGIS's zero-loss hourly output. Expert review to confirm (3.6). | 14percent | PVGIS user manual (EU Joint Research Centre), section 4.1 "System loss" | 5 November 2026 |
|---|
Solar used at home, cautious case without a battery (share of our model's figure)NotesDerived, not quoted. For our test home (docs/reference-checks.md), MGD 003's "in half the day" self-consumption is 21% at 3 kWp and 18% at 4 kWp; our model gives 31.7% and 25.2%. 21 ÷ 31.7 = 0.66 and 18 ÷ 25.2 = 0.71; we use the more cautious 66%. Only widens the low end of solar-only savings (the typical figure is unchanged) until calibration replaces it (docs/launch-checklist.md). | 66percent | MCS MGD 003 Issue 2.0 (2022), Table 7-12 ("in half the day"), against our reference check | 10 November 2026 |
|---|
Battery round-trip efficiencyNotesShare of energy stored in the battery that comes back out (page 2, "Solar to Battery to Home/Grid Efficiency 89%"). It includes inverter losses, which PVGIS's system loss also covers, so this is slightly cautious. One manufacturer: the only official datasheet found that states it. Expert review to confirm (3.6). | 89percent | Tesla Powerwall 3 datasheet (2026), "Solar to Battery to Home/Grid Efficiency" | 5 November 2026 |
|---|
Battery charge and discharge powerNotes"Configurable up to 5 kW" (page 2). Used as the charge and discharge limit for every battery size in v1 (decision O5). | 5kW | Tesla Powerwall 3 datasheet (2026), "Maximum Continuous Charge Power" | 6 November 2026 |
|---|
Typical battery warrantyNotesPage 2: "Warranty 10 years". Shown next to battery payback so visitors can see whether the battery is likely to pay back within its warranty (decision O4). | 10years | Tesla Powerwall 3 datasheet (2026), "Warranty" | 6 November 2026 |
|---|
Power of one modern home solar panelNotesOnly turns system size (kWp) into an approximate number of panels for visitors ("4 kWp, about 9 to 10 panels"); never used in any calculation. LONGi datasheet: https://www.enfsolar.com/pv/panel-datasheet/crystalline/58847. No official UK figure for typical panel power was found (the Energy Saving Trust gives typical system size, about 4.5 kWp, but not panel power). Quotes may use other panels; older or cheaper ones are lower. The directory's titles and "Power Range" boxes differ slightly (Trina: title 430–460 W, box 450 Wp; LONGi: title 420–440 W, box 415–430 Wp), so the range covers both: 415–460 W. Widened from 420 on 8 November 2026; the panel counts shown didn't change. | 415 to 460watts per panel | ENF Solar panel directory, datasheets for two widely sold home panels: Trina Vertex S+ TSM-NEG9R.28 (430–460 W) and LONGi Hi-MO X6 Explorer LR5-54HTH (415–440 W) | 8 November 2026 |
|---|
Solar installation cost, systems up to 4 kWNotesSystems up to 4 kW. Low: median, all installations, 2025/26 ("Summary table (TIC)"). High: mean, domestic retrofit ("New build costs (TIC)", Retrofit (Domestic)). Includes fitting and VAT where applicable; excludes batteries. MCS-registered installations, GB. | 1,595.06 to 2,108.65GBP per kW of panel capacity | DESNZ, Solar PV cost data 2025/26 (Total Installed Capacity basis) | 6 November 2026 |
|---|
Solar installation cost, systems 4 to 10 kWNotesSystems over 4 kW up to 10 kW. Low: median, all installations, 2025/26. High: mean, domestic retrofit. Same tables as solar_cost_per_kw_0_4. | 1,545.89 to 1,651.4GBP per kW of panel capacity | DESNZ, Solar PV cost data 2025/26 (Total Installed Capacity basis) | 6 November 2026 |
|---|
Battery installation cost, 1 to 6 kWhNotesBatteries 1–5.99 kWh, 2025-26 ("Annual" sheet; MCS-certified batteries retrofitted to existing homes, new-build and commercial excluded, per the cover sheet): mean £1,280, median £1,300. Includes fitting and VAT where applicable. Statistics in development. | 1,280 to 1,300GBP per kWh of nominal capacity | DESNZ, MCS certified domestic battery installation statistics (April 2025 to March 2026) | 6 November 2026 |
|---|
Battery installation cost, 6 to 11 kWhNotesBatteries 6–10.99 kWh, 2025-26. Mean £870, median £890. | 870 to 890GBP per kWh of nominal capacity | DESNZ, MCS certified domestic battery installation statistics (April 2025 to March 2026) | 6 November 2026 |
|---|
Battery installation cost, 11 to 30 kWhNotesBatteries 11–29.99 kWh, 2025-26. Median £630, mean £670. | 630 to 670GBP per kWh of nominal capacity | DESNZ, MCS certified domestic battery installation statistics (April 2025 to March 2026) | 6 November 2026 |
|---|
Extra cost of a battery fitted at the same time as new panelsNotesNo official figure exists yet (DESNZ and MCS price solar and batteries as separate jobs; docs/reference-checks.md). Low: Octopus's "most popular" package, 12 panels (about 455 W each, 5.46 kWp) with a 10 kWh battery for £11,115, minus the DESNZ 2025/26 median for 5.46 kWp of solar alone (£1,545.89 × 5.46 = £8,441), leaves £2,674 for the battery, £267 per kWh. High: Octopus's battery-only price, "At present, our prices start at ... £5,336 for an smart 10kWh battery" (https://octopus.energy/blog/battery-only-installation/, undated), £534 per kWh: a separate job, so an upper bound for the extra when fitted with panels. (Until 14 November 2026 the high end was £472, from a Fox EVO 10.24 kWh price of £4,836 that is no longer on Octopus's options page.) One supplier only: replace when DESNZ or the expert reviewer gives better data. Used only when panels are bought too; battery-only upgrades use the battery_cost_per_kwh_* figures. | 267 to 534GBP per kWh of battery capacity | Octopus Energy, published solar and battery prices (July 2026 prices), with DESNZ Solar PV cost data 2025/26 | 14 November 2026 |
|---|
Electricity price cap: unit rateNotesElectricity, single-rate meter, Direct Debit, average across England, Scotland and Wales. Used for homes before solar and for solar without a battery (decision S1). Regional rates later. | 26.32p/kWh | Ofgem, Energy price cap unit rates and standing charges (1 Oct to 31 Dec 2026) | 5 November 2026 |
|---|
Electricity price cap: standing chargeNotesElectricity, Direct Debit, average across England, Scotland and Wales. | 54.83p/day | Ofgem, Energy price cap unit rates and standing charges (1 Oct to 31 Dec 2026) | 5 November 2026 |
|---|
Export rate for solar without a batteryNotesFlat export rates for solar without a battery. Low: Outgoing Smart Export Guarantee 12M fixed, 4.1p (OUTGOING-SEG-FIX-12M-26-10-21). High: Outgoing Octopus, 12p (OUTGOING-VAR-24-10-26). Same in every region. One supplier: a market-wide range later. Decision V1 (6 Nov 2026): results use the high rate and show the low rate separately. Outgoing Octopus eligibility (https://octopus.energy/outgoing/, checked 6 Nov 2026): be an Octopus Energy customer on an eligible import tariff, have a smart meter sending half-hourly export data, and no Feed-in Tariff payments in the last 12 months. | 4.1 to 12p/kWh | Octopus Energy public tariff API (Outgoing SEG fixed; Outgoing Octopus) | 5 November 2026 |
|---|
Octopus Flux import: cheap rateNotes02:00–05:00 UK time. Our average of Octopus's 14 regional rates for 4 Nov 2026 (link shows region C, London: 16.17p). Flux is for homes with solar and a battery (decision S2). | 16p/kWh | Octopus Energy public tariff API, Octopus Flux Import (FLUX-IMPORT-23-02-14) | 5 November 2026 |
|---|
Octopus Flux import: day rateNotesAll hours outside the cheap and peak bands. Average of 14 regions (London 26.78p). | 26.5p/kWh | Octopus Energy public tariff API, Octopus Flux Import (FLUX-IMPORT-23-02-14) | 5 November 2026 |
|---|
Octopus Flux import: peak rateNotes16:00–19:00 UK time. Average of 14 regions (London 37.38p). | 37p/kWh | Octopus Energy public tariff API, Octopus Flux Import (FLUX-IMPORT-23-02-14) | 5 November 2026 |
|---|
Octopus Flux: standing chargeNotesAverage of 14 regions (range 42.29p to 66.74p). | 54.34p/day | Octopus Energy public tariff API, Octopus Flux Import standing charges | 5 November 2026 |
|---|
Octopus Flux export: cheap rateNotes02:00–05:00 UK time. Average of 14 regions (London 4.72p). | 4.67p/kWh | Octopus Energy public tariff API, Octopus Flux Export (FLUX-EXPORT-23-02-14) | 5 November 2026 |
|---|
Octopus Flux export: day rateNotesAll hours outside the cheap and peak bands. Average of 14 regions (London 11.11p). | 11p/kWh | Octopus Energy public tariff API, Octopus Flux Export (FLUX-EXPORT-23-02-14) | 5 November 2026 |
|---|
Octopus Flux export: peak rateNotes16:00–19:00 UK time. Average of 14 regions (London 30.31p). | 30p/kWh | Octopus Energy public tariff API, Octopus Flux Export (FLUX-EXPORT-23-02-14) | 5 November 2026 |
|---|
Octopus Flux cheap hoursNotesCheap band runs 02:00–05:00 (the rates' valid_from/valid_to, 4 Nov 2026, GMT). Stored as { low: start hour, high: end hour }. Follows UK clock time all year: before 25 Oct 2026 (BST) the band ran 01:00–04:00 UTC, i.e. 02:00–05:00 UK time. | 2 to 5hour of day, UK clock (start, end) | Octopus Energy public tariff API, Octopus Flux Import unit rates (band times) | 5 November 2026 |
|---|
Octopus Flux peak hoursNotesPeak band runs 16:00–19:00 (4 Nov 2026, GMT); in BST 15:00–18:00 UTC, so 16:00–19:00 UK time all year. Stored as { low: start hour, high: end hour }. | 16 to 19hour of day, UK clock (start, end) | Octopus Energy public tariff API, Octopus Flux Import unit rates (band times) | 5 November 2026 |
|---|
Last day of 0% VAT on installed solar panelsNotes"A zero rate applies to the installation of certain specified energy-saving materials from 1 May 2023 to 31 March 2027" (solar panels listed in 2.7). Batteries installed in homes have had the zero rate since 1 February 2024 (2.19), but the notice (updated 31 January 2024) doesn't state their end date. Official cost figures include VAT where it applies, so costs and paybacks need updating before 1 April 2027 (launch checklist). | 31 March 2027date | HMRC VAT Notice 708/6, paragraph 2.1 | 8 November 2026 |
|---|
VAT on installed solar panels from 1 April 2027Notes"From 1 April 2027 onwards these will revert to the reduced rate of VAT of 5%." | 5percent | HMRC VAT Notice 708/6, paragraph 2.1 | 8 November 2026 |
|---|
Warm Homes: Local Grant household income limit (usual)Notes"Your household income must usually be £36,000 a year or less." England only; home privately owned (by you or your landlord) with an EPC rating of D to G. Higher earners may qualify in certain postcode areas or if someone in the household gets certain benefits. Solar panels are listed as a possible improvement. Depends on the council having funding. | 36,000GBP household income a year | GOV.UK, Apply for the Warm Homes: Local Grant | 8 November 2026 |
|---|
Last day of the ECO4 schemeNotes"The ECO4 scheme commenced on 27 July 2022 and will run until 31 December 2026" (extended by nine months from March 2026). Supplier-funded energy improvements for lower-income households. The Warm Homes Plan merges low-income schemes into one from 2027/28. The guidance page itself says "The ECO4 Order commenced on 27 July 2022 and runs until 31 December 2026." | 31 December 2026date | Ofgem, Energy Company Obligation (ECO4) guidance: supplier administration | 8 November 2026 |
|---|
EDF SEG Export Variable (open to anyone)NotesVariable. Open to customers of any supplier. Footnote: 2.0p from 28 October 2026 (3.0p before). EDF electricity customers can get SEG Export Variable Value instead. | 2p/kWh | EDF, Smart Export Guarantee tariffs | 9 November 2026 |
|---|
EDF SEG Export Variable Value (EDF customers)NotesVariable. "Exclusive to EDF electricity customers". The page's rate-history footnote is garbled; the tariff section is clearer. EDF's 13p "Export 12m V2" is left out: the card is still shown, but its terms link (R1458 AW1 V6) is the document the same page lists as withdrawn on 2 March 2026. Rechecked 9 November 2026. | 5.6p/kWh | EDF, Smart Export Guarantee tariffs | 9 November 2026 |
|---|
EDF Export Exclusive 12m V3 (EDF installs)Notes12-month tariff, solar only, for solar and/or a battery bought from EDF after 2 March 2026. | 18p/kWh | EDF, Smart Export Guarantee tariffs | 9 November 2026 |
|---|
British Gas Export SEG (non-customers)NotesFor people who don't buy their electricity from British Gas (and developers). Stated in the FAQ "What is the SEG rate if I'm a social landlord or developer?". | 3p/kWh | British Gas, Smart Export Guarantee tariffs (updated 27 August 2026) | 9 November 2026 |
|---|
British Gas Export Premium (British Gas customers)NotesVariable. British Gas electricity customers, systems up to 15kW. The heading prints "£12p per kWh" (a typo); the legal note says "up to 12p per kWh". Needs a smart meter recording half-hourly export and an MCS (or equivalent) certificate. Systems over 15kW get Export Extra (8p) instead. | 12p/kWh | British Gas, Smart Export Guarantee tariffs (updated 27 August 2026) | 9 November 2026 |
|---|
E.ON Next Flex Export (open to anyone)NotesVariable. No E.ON Next import tariff required. Smart export meter needed. | 6p/kWh | E.ON Next, Smart Export Guarantee | 9 November 2026 |
|---|
E.ON Next Export Exclusive v3 (E.ON Next customers)NotesFixed for 12 months. Needs an E.ON Next import tariff, but not a time-of-use one such as Next Drive. Residential, up to 15kW, smart export meter. | 13p/kWh | E.ON Next, Smart Export Guarantee | 9 November 2026 |
|---|
E.ON Next Export Premium v3 (E.ON installs)NotesFixed for 12 months. Solar and/or battery installed by E.ON from 10 November 2025. | 17.5p/kWh | E.ON Next, Smart Export Guarantee | 9 November 2026 |
|---|
OVO SEG (open to anyone)NotesElectricity supply with any provider. The page doesn't say fixed or variable and shows no date. | 4p/kWh | OVO, Smart Export Guarantee | 9 November 2026 |
|---|
OVO SEG Beyond Exclusive (OVO customers)NotesElectricity supply with OVO, system under 30kW. No date on the page. | 12p/kWh | OVO, Smart Export Guarantee | 9 November 2026 |
|---|
OVO SEG Install Exclusive (OVO installs panels and a battery)Notes"Up to 20p": OVO installs panels and a battery; 15p if OVO installs panels only. OVO supply needed. | 20p/kWh | OVO, Smart Export Guarantee | 9 November 2026 |
|---|
Good Energy Solar Savings (Good Energy customers)NotesVariable. "Available to Good Energy supply customers with solar panels". No date on the page. | 12p/kWh | Good Energy, Export tariffs | 9 November 2026 |
|---|
Good Energy Solar Savings Exclusive (Good Energy installs)NotesFixed for 12 months, then the standard Solar Savings rate. Only if Good Energy Solar installed your panels and battery. | 25p/kWh | Good Energy, Export tariffs | 9 November 2026 |
|---|
England: new solar permitted development rules startNotesSeparate rules for houses and blocks of flats; plug-in solar added; listed homes excluded from Class A. | 27 August 2026date | The Town and Country Planning (General Permitted Development) (England) (Amendment) Order 2026 (SI 2026/896) | 9 November 2026 |
|---|
England: last day to use the old solar rulesNotesWork allowed under the old rules but not the new ones can still go ahead until the end of this day. | 26 August 2027date | SI 2026/896, article 6 (transitional provision) | 9 November 2026 |
|---|
England: most panels can stick out from a sloping roofNotes"protruding more than 0.2 metres beyond the roof slope" is not allowed; nor is any part higher than the highest part of the roof. | 0.2metres | GPDO 2015 Schedule 2 Part 14, Class A, A.1(2)(c) | 9 November 2026 |
|---|
England: most panels can rise above a flat roofNotesNot "more than 0.6 metres higher than the highest part of the roof (excluding any chimney)". On article 2(3) land (conservation areas, National Parks, the Broads, AONBs, World Heritage Sites) flat-roof panels need prior approval from the council first. | 0.6metres | GPDO 2015 Schedule 2 Part 14, Class A, A.1(2)(d) and A.2 | 9 November 2026 |
|---|
England: most panels can stick out from a wall next to a roadNotesWhere the wall abuts a highway. Same limit for a balcony or roof enclosure next to a highway. | 0.2metres | GPDO 2015 Schedule 2 Part 14, Class A, A.1(2)(a)(i) | 9 November 2026 |
|---|
England: most panels can stick out from other wallsNotesWalls (and balconies or roof enclosures) that don't abut a highway. | 0.4metres | GPDO 2015 Schedule 2 Part 14, Class A, A.1(2)(a)(ii) | 9 November 2026 |
|---|
England: largest panel area for garden (stand-alone) solarNotesTotal surface area of the solar panels, for a dwellinghouse. | 9square metres | GPDO 2015 Schedule 2 Part 14, Class B, B.1(2) | 9 November 2026 |
|---|
England: tallest garden solar, away from boundariesNotes"In all other cases". The lowest limit that applies is the one that counts. | 4metres | GPDO 2015 Schedule 2 Part 14, Class B, B.1(2) height table | 9 November 2026 |
|---|
England: tallest garden solar within 5 metres of a boundaryNotesAlso 2 metres in a conservation area where the solar is nearer a highway than the house (which also needs prior approval). | 2metres | GPDO 2015 Schedule 2 Part 14, Class B, B.1(2) height table | 9 November 2026 |
|---|
England: tallest garden solar near a boundary in front of the houseNotesWithin 5 metres of the boundary and forward of the principal elevation (usually the front wall). | 1metres | GPDO 2015 Schedule 2 Part 14, Class B, B.1(2) height table | 9 November 2026 |
|---|
England and Wales: distance from a boundary where lower height limits applyNotesEngland: within 5 metres of the curtilage boundary. Wales: "within 5 metres of the property boundary" (gov.wales/planning-permission-solar-panels). | 5metres | GPDO 2015 Schedule 2 Part 14, Class B, B.1(2); GOV.WALES, Planning permission, solar panels | 9 November 2026 |
|---|
Wales: most panels can stick out from a roof or wallNotes"should not be installed above the ridgeline and should project no more than 200mm from the roof or wall surface". Houses only. | 200millimetres | GOV.WALES, Planning permission, solar panels | 9 November 2026 |
|---|
Wales: flat-roof panels, distance from the edge and height above the roofNotesPanels "cannot be sited within 1 metre of the external edge of the roof" or "protrude more than 1 metre above the plane of the roof". | 1metres | GOV.WALES, Planning permission, solar panels | 9 November 2026 |
|---|
Wales: largest panel area for garden (stand-alone) solarNotesOne stand-alone panel only; no dimension over 3 metres; at most 4 metres tall (2 metres within 5 metres of the boundary); not within 5 metres of the highway. | 9square metres | GOV.WALES, Planning permission, solar panels | 9 November 2026 |
|---|
Wales: tallest garden solar, away from boundariesNotes"no part of the installation must exceed 4 metres in height"; 2 metres within 5 metres of the property boundary. | 4metres | GOV.WALES, Planning permission, solar panels | 9 November 2026 |
|---|
Wales: tallest garden solar within 5 metres of a boundaryNotesIf within 5 metres of the property boundary, "it cannot be more than 2 metres in height". | 2metres | GOV.WALES, Planning permission, solar panels | 9 November 2026 |
|---|
Wales: longest side of garden (stand-alone) solarNotes"no dimension of the panel should be greater than 3 metres". | 3metres | GOV.WALES, Planning permission, solar panels | 9 November 2026 |
|---|
Wales: closest garden solar can be to the roadNotes"the panel shall not be within 5 metres of the highway". | 5metres | GOV.WALES, Planning permission, solar panels | 9 November 2026 |
|---|
Typical size of a home solar systemNotes"The average solar panel system is around 4.5 kilowatt peak (kWp)." Under "Do I have enough space?". | 4.5kWp | Energy Saving Trust, Solar panels (last updated 1 October 2026) | 9 November 2026 |
|---|
Roof area a typical home solar system coversNotes"A 4.5kWp system typically covers between 20 to 30m2 of roof surface area, typically using around 12 panels." | 20 to 30square metres | Energy Saving Trust, Solar panels (last updated 1 October 2026) | 9 November 2026 |
|---|
Panels in a typical home solar systemNotes"typically using around 12 panels" for 4.5 kWp, which implies about 375 W panels; newer panels (panel_power_w) mean fewer for the same size. | 12panels | Energy Saving Trust, Solar panels (last updated 1 October 2026) | 9 November 2026 |
|---|
Most a plug-in solar device may supplyNotesA plug-in microgenerator "has a maximum rated alternating current output not exceeding 800 watts". In force 27 August 2026, Great Britain. Our model treats the kit as 0.8 kWp of panels. | 800watts (AC) | The Plugs and Sockets etc. (Safety) Regulations 1994 and Electricity Safety, Quality and Continuity Regulations 2002 (Amendment) Regulations 2026 (SI 2026/848) | 9 November 2026 |
|---|
Starting price of a plug-in solar kitNotes"Plug-in solar panel devices that meet UK regulations cost from around £450", including panels, microinverter, mounting brackets and cables. A starting price, not a typical one. | 450GBP | Energy Saving Trust, Plug-in solar panels (last updated 1 October 2026) | 9 November 2026 |
|---|
Energy Saving Trust: a year's output from an 800 W plug-in kitNotes"around 700 kWh across the year". Their method: Manchester, south-facing, 30°, no shading. For comparison with our model only. | 700kWh a year | Energy Saving Trust, Plug-in solar panels (last updated 1 October 2026) | 9 November 2026 |
|---|
Energy Saving Trust: yearly saving from an 800 W plug-in kitNotes"Home all day: £100 a year. Out during the day: £70 a year." At 24.7p a unit and 2,500 kWh a year. For comparison with our model only. | 70 to 100GBP a year | Energy Saving Trust, Plug-in solar panels (last updated 1 October 2026) | 9 November 2026 |
|---|
Date plug-in solar became legal to use in Great BritainNotes"Coming into force 27th August 2026." Made 16 July 2026. Great Britain only; not Northern Ireland. | 27 August 2026date | SI 2026/848 (plug-in solar electrical safety amendments) | 9 November 2026 |
|---|
How long solar panels can lastNotesThe panels "themselves can last over 25 years", though the inverter may need replacing in that time. The Energy Saving Trust gives "25 years or more" on its main solar page and "around 30 years" on its maintenance page; we quote the cautious figure. | 25years (more than) | MCS, Solar photovoltaic (PV) | 11 November 2026 |
|---|
Typical performance warranty on solar panelsNotes"Solar panels usually come with a 25-year performance warranty and a five to 10-year product warranty." | 25years | Energy Saving Trust, Buying a house with solar panels (last updated 6 October 2026) | 11 November 2026 |
|---|
How often an inverter typically needs replacingNotes"Solar inverters ... typically need to be replaced every 10 to 15 years." Under "How much does it cost to maintain solar panels?". EST's main solar page says "around 12 years", inside this range. | 10 to 15years | Energy Saving Trust, How to clean and maintain solar panels (last updated 1 October 2026) | 11 November 2026 |
|---|
Typical cost to replace an inverterNotes"This usually costs around £800." Not in our payback figures, which say so (simple payback). | 800GBP | Energy Saving Trust, How to clean and maintain solar panels (last updated 1 October 2026) | 11 November 2026 |
|---|
Cooling-off period for contracts made at home, online or by phoneNotes"you get a 14-day cooling-off period" for services arranged online, by phone, or away from the business's premises (if £42 or more). It "begins the day after you enter a contract". If work starts early at your request, the business can keep what covers the work done. | 14days | Citizens Advice, Cancelling a service you've arranged | 11 November 2026 |
|---|
Average battery size, 1 to 6 kWh bandNotesBand 1-5.99 kWh, 2025-26 ("Annual" sheet): total capacity in sample 83,560 kWh divided by 16,270 installations, to two decimal places. Used with the band's cost per kWh to fit a fixed cost per job plus a cost per kWh for batteries added on their own. | 5.14kWh per installation | DESNZ, MCS certified domestic battery installation statistics (April 2025 to March 2026) | 15 November 2026 |
|---|
Average battery size, 6 to 11 kWh bandNotesBand 6-10.99 kWh, 2025-26 ("Annual" sheet): total capacity in sample 141,650 kWh divided by 14,457 installations, to two decimal places. Used with the band's cost per kWh to fit a fixed cost per job plus a cost per kWh for batteries added on their own. | 9.8kWh per installation | DESNZ, MCS certified domestic battery installation statistics (April 2025 to March 2026) | 15 November 2026 |
|---|
Average battery size, 11 to 30 kWh bandNotesBand 11-29.99 kWh, 2025-26 ("Annual" sheet): total capacity in sample 188,540 kWh divided by 12,176 installations, to two decimal places. Used with the band's cost per kWh to fit a fixed cost per job plus a cost per kWh for batteries added on their own. | 15.48kWh per installation | DESNZ, MCS certified domestic battery installation statistics (April 2025 to March 2026) | 15 November 2026 |
|---|